POWER SYSTEM TESTING
Service Corresponding Remarks | ||
item | Remarks (Chinese version) | Remark(Eng. Ver.) |
1 | ||
2 |
service request form | |||
serial number | Service Content | Form (Chinese version) | SRF (Eng. Ver.) |
6.1.1 | Insulation resistance test | ||
6.1.2 | Power frequency withstand voltage test | ||
6.1.3 | Ground Resistance Test | ||
6.1.4 | Operating time test of residual current operating protector | ||
6.3.1 | Integrated cabling - twisted pair test | ||
6.3.2 | Integrated cabling-fiber test | ||
6.3.3 | Video Surveillance System Test | ||
6.3.4 | Access control system test | ||
6.3.5 | TV System Test | ||
6.3.6 | Parking lot entrance and exit control system test | ||
6.3.7 | Parking guidance system test in parking lot | ||
6.3.8 | Testing of intelligent monitoring and management system for building facilities environment | ||
6.2.1-6.2.7 | Power System Testing (2) |
For power system testing (6.1.1~6.3.8), please call the high-tech department's direct line: 8291 4722
For power system testing (6.2.1~6.2.7), please call the direct line of the thermal and environmental engineering department: 8291 4725